If we want a product to achieve the corresponding quality or effect, we must install or construct according to the right method, so as to have a good effect. HJSD steel structure workshop is one of them. Then HJSD steel structure workshop has some wonderful measures to improve the installation quality. Let’s learn about it.
There are various types of workshops, which can be divided into multi-storey steel structure workshop, single-layer steel structure workshop, light steel structure workshop, brick concrete structure workshop and so on.According to the requirements of different buildings, different quality treatment can ensure the quality of buildings.In order to improve the installation accuracy of steel structure workshop, we must attach great importance to the production, transportation, installation and other main links, so as to guarantee the installation quality of the structure.
The fabrication of steel members should be accurate in size, with a certain amount of shrinkage pre placed, steel thickness, production quality requirements, screw hole position and other requirements must be in place, and they can be transported to the construction site for installation after they are accurate.The installation process shall be carried out in accordance with the corresponding sequence, and the parts of the workshop with inter column support, tie bar and roof support shall be installed first.After the hoisting of this part of steel column, the axis and elevation of the steel column shall be retested first. After correcting the deviation, the steel column shall be temporarily stabilized with cable wind rope, and then the support between columns, roof beam and tie bar between beams shall be installed, which is called rough installation.Before the installation of roof beam, it should be assembled on the ground first, and then hoisted after passing the measurement.After the beam is in place, it is connected with high-strength bolts, and other parts are fixed with corresponding bolts, but all kinds of bolts should not be locked.After the components are fixed, the axis and elevation of the steel column are retested and corrected again, that is, fine adjustment.
The bolt connection should be tightened. The installation and welding of the steel structure workshop should form an independent and stable structure as soon as possible. The factory building should form an independent and stable structure, which can disperse the accumulated error generated during the installation of the whole plant to each part, and can also avoid the deformation or falling off or even overturning of the installed steel members due to the influence of natural conditions.The installation and connection of each part should be made according to the actual functional requirements. Only according to the design drawings and construction drawings can the installation quality of the steel structure workshop be guaranteed.
For HJSD steel structure plant how to improve the installation quality of the small editor here, if you want to know more about HJSD steel structure plant information, welcome to consult, we have more high-quality products to provide you, to meet your needs,
Post time: Jul-13-2020