How can the movable steel structure plank house do the moisture proof work better?
1.Take up the glass wool and install the wall color steel plate;
2.Facing the indoor side, the veneer is rolled from the eaves to the wall corner, and the double-sided tape is used to fix the glass felt on the purling at the lowest end, leaving an additional 20 cm;
3.The transverse connection of cotton and cotton is connected by binding with stapler on the trimming flash.
4.Cut off the glass wool felt 20 cm above the purling on the wall top and fix it with double-sided adhesive tape.
be careful:
1. According to the needs of the project, in order to avoid the cold bridge, the roof construction can consider to pad some rigid thermal insulation materials on the purling.
2.During the installation, the tension and alignment of the glass wool felt shall be kept, and the joint between the roll and the roll shall be tight. When the longitudinal overlap is required, the overlap shall be arranged at the purling.