Problems of steel structure during construction

Problems of steel structure during construction

What are the problems of steel structure during construction?

1、 Welding procedure.It can be said that this link is easy to have quality problems during the whole steel structure construction period, because it has a direct relationship with the technology of operators and the arrangement of working procedures.Through the analysis of some accidents happened in the past, it can be seen that in many cases, the structure is abnormal because of the welding problems.

2、 Coating process can not be ignored.Compared with the welding process, the importance of the coating process is to ensure that the paint film on the surface of the component is intact.In every steel structure construction, professional painting technology can be used to operate, so as to ensure that the component surface does not have the phenomenon of insufficient film thickness, surface film falling off, etc 

3、 Setting out and blanking is also a key process.It can even be said that this process has a direct impact on steel structure blanking.Therefore, it is necessary to strengthen the supervision before blanking to ensure the smooth progress of the process, especially to pay attention to the occurrence of abnormal situations such as horse teeth, nodule and so on. 

4、 The last process is assembly.Scientific and reasonable assembly plays an important role in improving the construction speed and quality of steel structure, which is especially high for the requirements of assembly drawings, so it is very important to ensure the reasonable size of drawings. 

How about anti-corrosive coating of Guiyang steel structure?

1. environment: before coating, in addition to the surface of the base material or the previous coating to be cleaned and dry, the temperature of the base material should be more than 3 ℃ higher than the dew point temperature; in addition, the construction should be able to be carried out when the relative humidity is less than 85%.After derusting, the anti-rust primer shall be applied. When the relative humidity is not more than 65%, the primer shall be applied within 8 hours after derusting, and the relative humidity is 65-85%. The primer shall be applied within 4 hours after derusting. 

 2. interval time: after the completion of one coat of paint, before the next coat of paint, it must be acknowledged whether the regular interval time has been reached, otherwise the painting cannot be carried out.If the painting is to be carried out after the longest painting interval, the previous paint shall be roughened with fine sandpaper, and the dust and impurities shall be removed before painting in the future. 


Post time: Jun-28-2020