What is the preparation of steel structure processing before entering the site?

What is the preparation of steel structure processing before entering the site?

As a base of modernization construction, the requirements of steel structure processing are required by all departments and industries.We have known the production preparation in the steel structure processing process before, so what are the preparations for Guiyang steel structure processing before entering the site?

The preparations for steel structure processing before entering the site are as follows:

 

1.constructors and relevant personnel shall arrive at the construction site to prepare for installation.

2.the construction personnel shall fully implement the design drawings, difficulties and key points of the construction plan to the team in terms of education quality, construction period and safety before entering the site.

3.Carry out on-site disclosure with Party A on raw materials, spare parts, equipment stacking yard, driving channel, water, electricity and accommodation coordination, and determine the construction plan of each process of construction funds and the cross operation coordination plan with the construction unit.

4.be responsible for the installation, transportation, lifting, positioning, calibration, bolt fastening, welding and installation of steel components.

5.the construction process shall be rechecked to ensure the quality, elevation, axis, geometric dimension, parallelism and other handover procedures of embedded parts.

6.Prepare hoisting machinery, equipment, tools, material plans and special tools according to the requirements of steel structure processing engineering.Prepare machines, tools and auxiliary materials. Implement vertical transportation conditions for cranes, welding machines, measuring instruments, hand tools and auxiliary tools.

7.Check and accept the positioning axis and elevation of steel members, and set out auxiliary lines for steel member installation.

8.According to the construction plan of the actual situation on site, make appropriate adjustment and supplement and report to the project management department for approval.

 

 