OEM/ODM Supplier Two Story Steel Structure - OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Good quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is regularly observed and pursued by our company for Pre Engineered Steel Buildings , Commercial Steel Fabrication , Steel Structure Shed Design , Our purpose is always to build Win-win scenario with our customers. We feel we are going to be your greatest choice. "Reputation To start with, Buyers Foremost. "Waiting for your inquiry.
OEM/ODM Supplier Two Story Steel Structure - OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda Detail:

Our group through specialist training. Skilled expert knowledge, sturdy sense of assistance, to fulfill the provider needs of shoppers for OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage, We warmly welcome prospects, organization associations and mates from everywhere in the earth to get in touch with us and request cooperation for mutual benefits.
Our group through specialist training. Skilled expert knowledge, sturdy sense of assistance, to fulfill the provider needs of shoppers for Cost To Build Steel Warehouse, Prefabricated Warehouse, Steel Structure Warehouse, We provide good quality but unbeatable low price and the best service. Welcome to post your samples and color ring to us .We will produce the goods according to your request. If you are interested in any products we offer, please feel free to contact us directly by mail, fax, telephone or internet. We are here to answer your questions from Monday to Saturday and looking forward to cooperating with you.
 

ARTS

ITEM

CONTENT

   Main steel frame

 

Steel column

H shape, Box, Steel pipe, Hot rolled sheet,

Steel beam

H shape, Hot rolled sheet

 

 

Supporting System

 

 

Purlin

C&Z purlin

Knee brace

Angle Steel

Tie Rod

Round bar

               Tie Bar

Circular Steel Pipe

Vertical&Horizontal Bracing

Angle Steel,Round Bar or Steel Pipe

 

 

  

Accessories

 

 

 

 

Roof&Wall Panel

EPS/Glass Fiber/Rock wool/PU Sandwich Panel or Steel Sheet For Free design Multi-span Easy Install Industrial Steel Structure Workshop

Doors

Sliding or Rolling door

Windows

Aluminum Alloy/PVC/Sandwich Panel

Gutter

Galvanized Steel plate, Stainless steel,PVC

Edge Cap

 Color steel sheet

Rain spout

PVC

Ventilator

Stainless steel

Bolts

Ordinary, High strength

Crane

Crane in 5 tons to 20 tons

框架图

 

 

 

 

 

Characteristics

(1). Free design Multi-span Easy Install Industrial Steel Structure Workshop Free to design architectural drawings for you.

(2). Features: Fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention.

(3). Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs.

(4). Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.

(5). Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it’s also in line with the national level of fire prevention.

(6). Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads.

1

 

 未标题-2

 

 

Design Requirements

Free design Multi-span Easy Install Industrial Steel Structure Workshop.Design Requirements: design Load: (very important)

1.Snow load: 2. Wind load:  3. Seismic magnitude: 4. Middle Column allowed or not:  5. Project location:  6. Length (side wall, m): 7. Width (end wall, m):  8. Wall Height (eave, m): 9. Mezzanine or not?

And usage: Building Purpose: we will recommend the best design for the purpose of the building

A. Warehouse/Storage B. Factory  C. Agriculture Barn D. Retail Store  E. Repair/Mechanic Shop F. Office Space G. Medical Warehouse H. Animal Farm (please confirm what kind of animal) 

 

 

 

 

 

 

 

 

 

 

 


Product detail pictures:

OEM/ODM Supplier Two Story Steel Structure -
 OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda detail pictures

OEM/ODM Supplier Two Story Steel Structure -
 OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda detail pictures

OEM/ODM Supplier Two Story Steel Structure -
 OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda detail pictures

OEM/ODM Supplier Two Story Steel Structure -
 OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda detail pictures

OEM/ODM Supplier Two Story Steel Structure -
 OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda detail pictures


Related Product Guide:
Photos: Peek inside Capital Region Lustron all-steel homes | Prefabricated Steel Structure
The ‘caveman’ computers that built Martin Tower, and the Bethlehem Steel engineer who helped them evolve | Steel Structure Beam And Column

We offer great strength in quality and development,merchandising,sales and marketing and operation for OEM/ODM Supplier Two Story Steel Structure - OEM Supply Cost To Build The Prefabricated Precision Steel Structure Warehouse Prefabricated Garage – Hongji Shunda , The product will supply to all over the world, such as: Nairobi , Ireland , Mombasa , Now we are sincerely consider to grant brand agent in different areas and our agents' maximum margin of profit is the most important thing we care about. Welcome all of the friends and customers to join us. We are ready to share win-win corporation.
  • Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Ann from India - 2017.09.30 16:36
    The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Irene from Suriname - 2018.09.29 17:23
    Write your message here and send it to us