Short Lead Time for Steel Structure Warehouse Design Pdf - Prefabricated Steel Structure Metal Frame Aircraft Hangar – Hongji Shunda

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We not only will try our greatest to offer you excellent services to just about every client, but also are ready to receive any suggestion offered by our buyers for Steel Frame Workshop , Steel Structure Fabrication , Industrial Steel Structures , We promise to try our best to provide you with high quality and efficient services.
Short Lead Time for Steel Structure Warehouse Design Pdf - Prefabricated Steel Structure Metal Frame Aircraft Hangar – Hongji Shunda Detail:

PRODUCTION INTRODUCTION

00016_14

 

Prefabricated Steel Structure Metal Frame Aircraft Hangar is a new type of steel structure buildings. It is easy assembly, quick installation,long life,recycle using factors, the steel structure buildings is replacing the traditional concrete buildings or brick buildings.

MORE PICS SHOW

1

2

COMPONENTS OF STEEL STRUCTURE

xq

APPLICATION OF STEEL STRUCTURE

xq2

Steel structure building has the advantage of lightweight and easy assembly. so it is mainly used as big warehouse, workshop, sports hall, steel hangar house, Office building.etc

Design Requirements

Basic Design Requirements: design Load: (very important)

1.Snow load: 2. Wind load:  3. Seismic magnitude: 4. Middle Column allowed or not:  5. Project location:  6. Length (side wall, m):  7. Width (end wall, m):  8. Wall Height (eave, m): 9. Mezzanine or not?

And usage: Building Purpose: we will recommend the best design for the purpose of the building

A. Warehouse/Storage B. Factory  C. Agriculture Barn D. Retail Store  E. Repair/Mechanic Shop F. Office Space G. Medical Warehouse H. Animal Farm (please confirm what kind of animal) 

ADVANTAGE OF STEEL STRUCTURE

1. Environmental friendly                                           2. Low cost and maintenance
3. Long using time up to 50 years                             4. Stable and earthquake resistance up to 9 grade
5. Fast construction, time saving and labor saving   6. Good appearance
7. Easy assembly and disassembly several times without damage


Product detail pictures:

Short Lead Time for Steel Structure Warehouse Design Pdf -
 Prefabricated Steel Structure Metal Frame Aircraft Hangar – Hongji Shunda detail pictures

Short Lead Time for Steel Structure Warehouse Design Pdf -
 Prefabricated Steel Structure Metal Frame Aircraft Hangar – Hongji Shunda detail pictures

Short Lead Time for Steel Structure Warehouse Design Pdf -
 Prefabricated Steel Structure Metal Frame Aircraft Hangar – Hongji Shunda detail pictures


Related Product Guide:
Apartments for rent in Minneapolis: What will $1,400 get you? | China Steel Structure Warehouse
Solar-powered prefab tiny house will do it all for $125K | China Steel Structure Warehouse

We are going to make every single effort for being excellent and excellent, and accelerate our ways for standing while in the rank of international top-grade and high-tech enterprises for Short Lead Time for Steel Structure Warehouse Design Pdf - Prefabricated Steel Structure Metal Frame Aircraft Hangar – Hongji Shunda , The product will supply to all over the world, such as: Madagascar , Uruguay , Roman , Nowadays our products sell all over the domestic and abroad thanks for the regular and new customers support. We provide high quality product and competitive price, welcome the regular and new customers cooperate with us!
  • Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Mona from Wellington - 2018.09.19 18:37
    Speaking of this cooperation with the Chinese manufacturer, I just want to say"well dodne", we are very satisfied.
    5 Stars By Matthew Tobias from Armenia - 2017.05.02 18:28
    Write your message here and send it to us