Top Suppliers Prefabricated Steel Structure Shopping Mall - Metal Frame Hangar Steel Structure Hangar Warehouse – Hongji Shunda

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our pursuit and corporation aim should be to "Always satisfy our consumer requirements". We carry on to build and style and design remarkable quality items for both our outdated and new clients and reach a win-win prospect for our clients at the same time as us for Affordable Steel Buildings , Steel Structure System , Steel Building Structures , The continual availability of significant grade merchandise in combination with our excellent pre- and after-sales support ensures strong competitiveness in an increasingly globalized market.
Top Suppliers Prefabricated Steel Structure Shopping Mall - Metal Frame Hangar Steel Structure Hangar Warehouse – Hongji Shunda Detail:

Metal Frame Hangar Steel Structure Hangar Warehouse (4)

Benefits Of Using steel structure hangar

Fast, easy and cost-effective construction 

Thermal insulation and acoustical insulation

Excellent resistance to harsh weather conditions

It is able to create large spans

Environmentally friendly

It can be easily adapted to future uses

Long life span of steel frame

It can be customized to meet your project’s specifications.

Technical Features

The structural steel has a small cross-sectional dimension, which can create useful spaces for buildings, reduce building height and have a better appearance.

The light steel frame has good rigidity and light weight. The steel beams and columns can be assembled, making it easy to fabricate, transport and install.

The amount of steel used to construct light steel frame building is only 1/5-1/10 of common steel structure, thus it is an economical and reliable option.

Applications

It is an ideal solution to erect light duty industrial buildings, such as workshops, warehouses, sheds and storage. The scope of application includes: 

The building span is 9-24m, and column height is 4.5-9m. The roof load is small. 

This steel structure is suitable for factories where there are overhead cranes designed for light duty and moderate service, or no cranes inside the facility.

When the building span does not exceed 15m, and column height does not exceed 6m, the roof frame beam should be in the form of an equal-section frame. Otherwise, it should be variable section frame. The variable-section steel frame has reasonable force and also saves materials. However, it is not as convenient as the equal-section frame in terms of fabrication and structural connection.

Steel Structure Design And Main Components

steel structure hangar building uses steel as the primary structural element, mainly including steel columns, steel beams, purlins, bracing system and building envelope. It is usually custom designed and constructed to your requirements.

Primary structure: steel columns, steel beams, wind-resistant columns and runway beams. The main material is Q235B or Q345B. The column and beam generally use H-beam steel or C channel steel. The runway beams are used to support overhead crane system, so they are generally installed in the upper part of the factory.

Secondary structure: purlins, bracing systems. C-shaped purlins are commonly used to support wall and roof panels. While the Z-shaped purlins are ideal for large slope roof. The thickness of C-shaped purlins is 2.5mm or 3mm. The horizontal and vertical bracing systems are aimed for overall stability of the building.

Envelope material: color steel tile and sandwich panel. The thickness of commonly used color steel tile is below 0.8mm. While the thickness of sandwich panel can be 50mm, 75mm, 100mm or 150mm. In addition, the roof can be designed with color steel tile, insulation cotton and steel mesh for improved insulation.

In order to save energy as well as improve indoor lighting, the lighting panels are generally added to the roof. 

Light steel frame construction

Single span, double span, multi-span

Overhead crane and runway beam are available

Examples Of steel structure hangar For Your Reference

steel structure hangar workshop

It takes the form of light single-span steel frame. A 20 ton overhead crane designed for moderate service will be installed inside the building. Other types of light duty overhead cranes are available for you to choose from.

The roof is designed with organized drainage for simple and better facade effect. It uses polyurethane roof panel as well as self-cleaning panel to reduce the ash accumulation and keep the roof clean.

The wall uses polyurethane wall panel, which has excellent heat and sound insulation. 

The building has large span, better appearance, excellent bearing capacity and fast drainage. It is easy and fast to erect.

steel structure hangar warehouse

It is ideal for light warehousing. The steel warehouses can be either large or small.

Light weight galvanized steel structure

The steel is coated with a protective zinc to prevent it from rusting and corroding, thus the galvanized steel structure building has longer maintenance-free service life than an ordinary steel frame building. The thickness of coating can be varied to suit a range of environments.

Multi-storey steel frame building

The primary structure uses steel structure hangar frame. The building floor uses a combined form with steel structure and concrete. 

The roof panel uses profiled steel plate, and the wall uses polyurethane wall panel.

Choosing The Right Type For Your Building

The steel structure hangar can be designed into any size and shape on requests. There are several factors to consider when choosing a steel frame construction for your building.

The building length – the overall length of the building is depending on your requirements.

Column spacing – it can be 6m, 7.5m, 9m and 12m.

Span – it is generally in a range of 9m to 36m. When you require a large span, we can design a double span or multi-span based on your requirements.

Height – it is usually 4.5-9m when there are no cranes inside the facility. However, if you want to install an overhead crane, the height is determined by the required crane specifications.

Overhead crane and runway system – if one or more overhead cranes will be installed inside your building, you should specify the crane model, capacity, lifting height, work duty, runway length and so on.

Additional requirements, such as wall and roof insulation.

 


Product detail pictures:

Top Suppliers Prefabricated Steel Structure Shopping Mall -
 Metal Frame Hangar Steel Structure Hangar Warehouse – Hongji Shunda detail pictures

Top Suppliers Prefabricated Steel Structure Shopping Mall -
 Metal Frame Hangar Steel Structure Hangar Warehouse – Hongji Shunda detail pictures

Top Suppliers Prefabricated Steel Structure Shopping Mall -
 Metal Frame Hangar Steel Structure Hangar Warehouse – Hongji Shunda detail pictures


Related Product Guide:
Bizarre physics puzzler Human: Fall Flat now has Steam Workshop support | Prefab Workshop
Steel structure design drawing and construction drawing

"Sincerity, Innovation, Rigorousness, and Efficiency" could be the persistent conception of our organization for your long-term to establish alongside one another with shoppers for mutual reciprocity and mutual benefit for Top Suppliers Prefabricated Steel Structure Shopping Mall - Metal Frame Hangar Steel Structure Hangar Warehouse – Hongji Shunda , The product will supply to all over the world, such as: Angola , St. Petersburg , Brisbane , Ensuring high product quality by choosing the best suppliers, now we have also implemented complete quality control processes throughout our sourcing procedures. Meanwhile, our access to a large range of factories, coupled with our excellent management, also ensures that we can quickly fill your requirements at the best prices, regardless the order size.
  • This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
    5 Stars By Tom from Singapore - 2018.06.18 17:25
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Edward from Thailand - 2017.06.22 12:49
    Write your message here and send it to us